Railroad St Upgrade

Railroad Street had some issues, it was starting to look like a low maintenance road. It had been decades since any gravel had been added to this road and it resembled more of a dirt road. It also had two low areas that would fill with water and required a running start to get through. The low areas were filled with some over sized rock and then the majority of the road was given 36 tons of gravel. This took 6 trips to the quarry located north of Parker.