Kurt finishes concrete Oct 212017 Kurt Masterminded the concrete work for the Monroe Fire Dept’s new garage. He is seen here working the extra concrete that was dumped in front of the slab. There will be gravel poured on later to form a ramp for the garage. October 21, 2017 Posted by Brad at 8:36 pm Uncategorized